HS1000 1MW Tidal Device Achieves Full Export Power

ImageThe ANDRITZ HYDRO Hammerfest HS1000 tidal turbine that was installed and connected to the grid last December has spent the last few months undergoing tests at the EMEC test site in Orkney.

The initial testing period has been very positive with the device achieving full export power.

ANDRITZ HYDRO Hammerfest will be at Stand G110 and the Islay Energy Trust will be at the Argyll/HIE Stand L50 of All-Energy Conference (23rd to 24th May 2012)

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: